DMRC completes tunnel breakthrough on Aerocity–Tughlakabad corridor under phase-4 of Delhi Metro

DMRC has achieved a tunneling milestone at Aerocity–Tughlakabad corridor (Golden line) under Phase-4, it successfully completed a tunnel breakthrough in Tughlakabad Railway Colony. The 0.96 km tunnel lies between Tughlakabad and Tughlakabad Railway Colony. This achievement reflects the rapid pace of the construction work advancing closer to operational readiness.


Introduction:

In a major stride towards urban transit infrastructure development, DMRC has successfully achieved a tunnelling breakthrough on Tughlakabad Railway colony. Tunnel Boring Machine has completed a 0.96 km stretch between Tughlakabad and Tughlakabad Railway Colony, part of the Phase-4’s Aerocity–Tughlakabad corridor. This development showcases the DMRC’s commitment towards precise engineering using advanced technology and  timely execution of the project.

About the Aerocity–Tughlakabad Corridor:

  • Total length: 23.62 km
  • Number of stations: 15
  • Corridor Type: Mix of underground and elevated sections
  • Expected operational date: March 2026

The Aerocity–Tughlakabad corridor is one of the most strategic lines under Delhi Metro’s Phase-4 expansion. It will link the Violet Line (Kashmere Gate – Raja Nahar Singh) with the Airport Express Line, creating a vital connection between South Delhi and significant transit points like the Indira Gandhi International Airport.

This corridor will offer better metro connectivity to previously underserved areas in the southern part Delhi, supporting better mobility, less road traffic congestion and increased accessibility for regular commuters and travelers.

Strategic Importance:

  • The project is a vital part of the Metro system as it connects South Delhi to several key metro lines and airport.
  • The corridor enhances connectivity and reduces congestion in the high traffic zones.
  • It also links areas of South Delhi which are underserved, and improves travel experience for the commuters at areas like that.

Progress Highlights:

The Aerocity-Tughlakabad corridor has successfully completed several tunnel breakthroughs and construction work on scheduled time, an effort towards reinforcing the urban mobility infrastructure in Delhi. DMRC is not only focused on completing the project on time but also to provide high safety and quality standards.

Conclusion:

The tunneling milestone on the Golden line of Delhi Metro is a reflection of the fast paced construction on the Phase-4. With the tunnel breakthrough at the Aerocity Railway Colony the project is advancing closer to the operational readiness of the corridor. This project aims to improve regional connectivity and reduce traffic congestion by providing fast, smart and reliable transit solutions in Delhi.


Source: DMRC | Image Credit: DMRC

Join us to showcase Innovation in Rail & Metro sector of India- Book your Delegate Pass: https://railanalysis.in/info/delegate.html

 Timely insights, straight to your WhatsApp—stay updated with ease!

Telegram Logo PNG Images 2023Stay connected to the rail industry—timely news, straight to Telegram

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *



Next Story