The Commissioner of Railway Safety, Shri A.M. Chowdhary, inspected the newly constructed Pamban Bridge and Broad Gauge line between Pamban and Mandapam. A successful demonstration of the Vertical Lift Girder Span showcased its engineering brilliance. High-speed trials achieved 90 kmph, highlighting the bridge’s capability to ensure safe rail and marine traffic.
Key Inspection Details:
The inspection included a successful demonstration of the Vertical Lift Girder Span, an engineering marvel facilitating smooth rail and marine operations across the Palk Strait. Officials highlighted its innovative design and functionality.
Speed Trial Run:
Shri A.M. Chowdhary also led the semi high-speed trial run on the new line, with trains achieving 90 kmph on the section and 80 kmph on the bridge, ensuring safety and efficiency.
Official Presence:
Prominent officials, including Shri B. Kamalakar Reddy, Chief Project Manager (Coordination) RVNL, Shri Sushil Kumar Maurya, Chief Administrative Officer, Construction/Chennai Egmore, and Shri Sharad Srivastava, Divisional Railway Manager, Madurai Division, participated in the event.
Conclusion:
The successful inspection and trial of the new Pamban Bridge mark a significant milestone in Indian Railways’ engineering achievements. With its Vertical Lift Girder Span and robust design, the bridge is set to enhance connectivity and ensure the seamless movement of both rail and marine traffic, underscoring India’s infrastructural progress.
Source: Southern Railway – Press Release | Images Credit: SR