MMRC Signs Agreement with Larsen & Toubro (L&T) for Electrical System Works for Colaba-Bandra-Seepz Metro 3 Corridor

MMRC Signs Agreement with Larsen & Toubro (L&T) for Electrical System Works for Colaba-Bandra-Seepz Metro 3 Corridor

Want create site? With Free visual composer you can do it easy.

Date Of Post: 07 Apr, 2018

Mumbai: The Mumbai Metro Rail Corporation (MMRC), on Friday, signed an agreement with Larsen & Toubro (L&T) for electrical system works for the Colaba-Bandra-Seepz metro 3 corridor. Mr. A.A. Bhatt, Dir (Systems), MMRC; Mr. S.K. Gupta, Dir (Projects), MMRC; Mr. Abodh Khandelwal, Dir (Finance), MMRC & Mr. Puneet Arora, Head- Railway Systems, L&T along with other officials at the contract signing ceremony of Power Supply System (11/B PSS) for Mumbai Metro 3 corridor.

The scope of the contract includes design, installation, testing and commissioning of power supply works including receiving sub-stations, 110 kV cabling works, traction sub-stations, switching stations, auxiliary main sub-stations, SCADA system and integration with other systems.


Image Credit: Mumbai Metro 3

Did you find apk for android? You can find new Free Android Games and apps.

Leave a Reply

Be the First to Comment!

Notify of
avatar