ICF likely to roll out 10 more ‘Train 18’ trainsets by next year

ICF likely to roll out 10 more ‘Train 18’ trainsets by next year

Want create site? With Free visual composer you can do it easy.

Date of Post: 12 Dec, 2018

The Integral Coach Factory (ICF), Chennai hopes to make 2 more trainsets in Train 18 design this fiscal and ramp it up to 8 in the next, a top official said. “ICF will try to make 2 more Train 18 trainsets this financial year and up to 8 in the next financial year depending on the allotment from the Railway Board,” Sudhanshu Mani, General Manager, ICF, said.

More Information:

  • The cost of the trainset is set to go down in a gradual manner as the volumes go up.
  • The prototype of a Train 18 trainset cost Rs 100 crore.
  • Meanwhile, the ICF got the approval of the Railway Board for rolling out 4 more Train 18 trainsets this fiscal.
  • The Board made the decision at its meeting held on December 5.
  • The ICF will be informed about the needed changes in its production programme, it said.
  • The ICF has been asked to make the necessary arrangements for sourcing of material and schedule manufacturing activities to achieve the target.

About ‘Train 18’

  • The Train 18 prototype which is currently on trial, is a high-tech, energy efficient, self-propelled train set to replace the Shatabdi Express.
  • It has aerodynamically designed driver cabins at both ends for quicker turnaround at destinations.
  • Every alternative coach is motorised to ensure even distribution of power and faster acceleration or deceleration, according to the ICF.
  • The fully air-conditioned 16-coach train sports an advanced regenerative brake system which saves power.
  • There are also emergency talk-back units, through which passengers can talk to the crew in case of emergency.
  • CCTVs are provided in all coaches for safe and secure travel.
  • Among the features that enhance passenger comfort are-
    • Inter-connected fully sealed gangways
    • Automatic doors with retractable footsteps
    • Onboard Wi-Fi and infotainment
    • GPS-based passenger information system
    • Modular toilets with bio-vacuum systems
    • Rotational seats which can be aligned in the direction of travel (available only in the executive class)
    • Roller blinds and diffused LED lighting
    • Disabled-friendly toilets
  • The train 18 was conceived, designed and developed in about 18 months’ time as against the industry norm of about 4 years, the ICF officials said.

11 Dec, 2018: Titagarh Wagons bags Rs 1,561 crore order from Indian Railways for supply of wagons

10 Dec, 2018: Indian Railways Constructing World’s Tallest Railway Bridge in Manipur

10 Dec, 2018: Indian Railways selects 5 players through reverse-auction method to supply over 12,000 wagons


Author:

Deepak Kumar is a part of the content team of Rail Analysis India as a writer and analyst .
His focus is on new initiatives on the Railway Sector of India .
Please reach us at editor@railanalysis.com for more information .


 

Did you find apk for android? You can find new Free Android Games and apps.

Leave a Reply

Be the First to Comment!

Notify of
avatar