Date of Post: 20 Feb, 2019
The Union Cabinet chaired by Prime Minister Narendra Modi has approved the following proposals:
- Implementation of Ahmedabad Metro Rail Project Phase-II, which comprises two corridors of total length 28.254 i.e. Corridor 1 from Motera Stadium to Mahatma mandir for a length of 22.838 km. and Corridor 2 from GNLU to GIFT City for a length of 5.416 km at a total completion cost of Rs. 5384.17 crores.
- The institutional arrangement and legal framework for the project.
- Conditions of sanction of the project.
Benefits:
Implementation of the project will provided the much-needed additional public transport infrastructure to Ahmedabad and Gandhinagar.
Salient features:
To streamline the urban transportation system in Ahmedabad and Gandhinagar, which is stressed due to intensive developments, increase in the number of private vehicles and heavy construction in the city, putting stress on travel infrastructure and industrial activities, and by providing the people a safe, secure, reliable and comfortable public transport. Â The Metro Rail project itself is an innovation over the conventional system of urban transport. The project involves integration with other urban transport systems in an efficient and effective manner which is possible only by adopting innovative methods of designing, technology and institutional management.
Source: Pib
To know more about recent developments of Ahmedabad Metro –
20 Feb, 2019: PM Modi to inaugurate first phase of Ahmedabad Metro on March 4
12 Feb, 2019:Â Public Investment Board approves Metro rail projects in Patna, Agra, Kanpur, and Ahmedabad Metro phase-2
01 Feb, 2019:Â First trial run of Ahmedabad Metro rail conducted
( Please reach us at editor@railanalysis.com for more information. )
Leave a Reply
Be the First to Comment!