Bullet Train Update: Bids Invited For Construction of Sabarmati HSR Terminal for Mumbai-Ahmedabad High Speed Rail Project

Bullet Train Update: Bids Invited For Construction of Sabarmati HSR Terminal for Mumbai-Ahmedabad High Speed Rail Project

Want create site? With Free visual composer you can do it easy.

Date of Post: 09 Aug, 2018

New Delhi: National High Speed Rail Corporation Limited (NHSRCL) has invited bids “Design and Build Works for Construction of Sabarmati HSR Terminal for Mumbai-Ahmedabad High Speed Railway Project”.

More Information:

  • The Government of India through National High Speed Rail Corporation Limited (NHSRCL) now invites sealed Bids from eligible Bidders for “Design and Build Works for Construction of Sabarmati HSR Terminal (Package No. NHSRCIJCO/SBI-HUB/2018/7) for Mumbai-Ahmedabad High Speed Railway Project” (“the Works”).
  • The Works shall consist of detailed design and construction of a Terminal HUB Building for NHSRCL.
  • The detailed scope shall include-
    • Design and construction of Terminal Building with all required services and defined finishes along with Construction of FOOT OVER BRIDGES; including but not limited to;
    • Planning detailed Architectural drawings
    • Structural design
    • Obtaining statutory and local body approvals.
    • Civil and structural works
    • Architectural finishes
    • Electrical works (LV & HV)
    • Fire Fighting works
    • Rain Water Harvesting
    • Solar Panels
  • The scope of work shall include the methodology to ensure IGBC Gold Rating to “the Works”.
  • The location of the Works shall be at Sabarmati, Gujarat (India).

For More Details : Click Here


Source:  National High Speed Rail Corporation Limited


To know more about recent developments of Bullet Train projects-

27 July, 2018: NHSRCL Invites Tenders for Geotechnical Investigations & Plate Load Test For Mumbai-Ahmedabad High Speed Rail Project

07 July, 2018: Tender for first of the 60 bridges on the 508-km high-speed corridor floated

05 July, 2018: Maharashtra Government Allocates Rs 250 Crore for Mumbai-Ahmedabad Bullet Train Project


Author : 

Narinder Sharma is a part of the content team of Rail Analysis India as a writer and marketing executive.
His interest is in the Railways , Metro and Transportation Sector of India.
Please reach us at editor@railanalysis.com for more information.


 

Did you find apk for android? You can find new Free Android Games and apps.

Leave a Reply

Be the First to Comment!

Notify of
avatar